Bridge Sprouts Crop of Metal Rods

BridgeAug25With only a week to go until bridge finish deadline, the yawning gaps look just as wide as last week.  The only change is a sudden  crop of metal rods sticking up inside the forms built on each side of the bridge arch.

I suppose we are looking at the muscle that will hold the wall of concrete together when the gray stuff finally gets poured.  They’ll have to run the mower over it when they are done or we’ll have a permanent fringe pointing at the sky.

Only four business days to go before the end of the month and the promised delivery of the finished item. Next week’s bike foray to the site will be most interesting.  Perhaps I should bring my own shovel.

Leave a Reply

Your email address will not be published. Required fields are marked *